THE PUMP SYSTEM – THE HEART OF OUR BIOGAS PLANTS

Offering you a plant system without components inside the tank is only one of our core advantages. The heart of our biogas plant is the pump system in the central technical room (offered either as a prefabricated concrete building (RMB), a steel container (TC) or a building erected on site).

This module is located centrally between the primary and secondary digesters or the residue storage tank, and contains all necessary technical components; substrate pumps, substrate distribution system, substrate heat exchanger as well as electrical and process control technology. Due to the consistent modular design, an optimal adaptation of the piping and pump technology to meet your present and future needs is possible.

technical room

The technical room of a biogas plant of Sauter Biogas GmbH contains the substrate pumps, the substrate distribution system, the substrate heat exchanger as well as the electrical and control engineering. Everything is clearly laid out, easily accessible for possible maintenance work and modularly arranged.